YardSolver app iconYardSolver is now an app —Get it on Google Play· iPhone app coming soon
YardSolver
Know what you need. Buy exactly that.

Concrete Slab Calculator

Step 1 · Type your numbers Step 2 · See your answer Step 3 · Print your list

 

4 inches suits patios, walkways and shed bases. We add 10% extra automatically — ground is never perfectly level, and running short mid-pour is the worst outcome.

How to use this calculator

  1. Measure the slab: length, width, and thickness (4 inches is standard for paths and patios).
  2. Type the numbers in and choose bag size — 80 lb is the common one.
  3. Read the answer: concrete volume with 10% already added for waste, plus the bag count and cost.
  4. Print the list. For big pours, compare the ready-mix yards figure before buying dozens of bags.

How the maths works: The maths: length × width × thickness = volume, plus 10% for waste. Bags divide the volume by one bag's yield (an 80 lb bag makes about 0.60 cubic feet).

What are you using this for?

Tell us what you are making, and we will help you do it yourself. Type your project below — for example “a patio base” or “my tomato bed” — and we will show you the full method, step by step, using the estimate you just made.

A worked example

A 10 ft x 10 ft patio slab, 4 inches thick: 100 x 1/3 = 33.3 cubic feet. With the 10% extra that is 1.36 cubic yards for a ready-mix order — or 62 bags of 80 lb if you mix it yourself.

Keep going

Soil for the garden beside that patio? The Raised Bed Soil Calculator. Finishing the beds with mulch? The Mulch Calculator. Pouring late in the year? Pouring Concrete in Cold Weather gives the temperature rules before the truck is booked.

Questions people ask

How many 80 lb bags make a cubic yard?
About 45 bags — one bag makes roughly 0.6 cubic feet.

How thick should a slab be?
4 inches for patios and walkways; 5-6 inches for driveways — check your local code.

Are the costs exact?
No — typical store-price ranges for your country. This is an estimate — prices can go up or down.

Bags or ready-mix truck — which should I choose?
As a rule of thumb, past about 1 cubic yard a ready-mix truck is usually cheaper and far less work than mixing bags. Below that, bags win on simplicity.

How long do I have to place and finish concrete?
About 90 minutes from mixing on a mild day, less in heat. Have every tool and helper ready before the first bag or the truck arrives.